The Oklahoma Ecological Services Field Office (ESFO) has updated its project review process. Instead of requiring complete project packages for many routine project reviews, we now request that project proponents complete ALL applicable Determination Keys (DKey), including the new Oklahoma Statewide Determination Key, through the U.S. Fish and Wildlife Service's Information for Planning and Consultation (IPaC) system. Please utilize the following information when completing your project review request:
The Endangered Species Act (ESA) provides two avenues for project review:
- Section 7 of the ESA applies to Federal actions (projects involving federal permits, funding, authorization or activities), commonly referred to as section 7 ‘Consultation’.
- Section 10 of the ESA applies to non-Federal actions where federally-listed species could be adversely affected. This process ranges from technical assistance to the development of a Habitat Conservation Plan.
Project planning broadly falls into three types:
- Technical Assistance: For anyone seeking assistance or guidance on conservation of federally listed, proposed, or at-risk species.
- Informal Consultation: For Federal action, permit, fund, or license (Federal nexus) that is not likely to adversely affect species or critical habitat.
- Formal Consultation: For Federal action, permit, fund, or license (Federal nexus) that is likely to adversely affect species or critical habitat.
Submitting Project Review Packages to the Oklahoma Ecological Services Field Office
Step 1: Determine the Action Area of your project
The action area is defined by federal regulation (50 CFR §402.02) as all areas to be affected directly or indirectly by the action and not merely the immediate area involved in the action. This analysis is not limited to the "footprint" of the action nor is it limited by the federal agency's authority. This action area will be the area referenced in all project review steps that follow. Failure to correctly define the action area as instructed will result in incorrect outcomes, could cause delays, and may not comply with the ESA.
Consider the following activities when delineating your action area:
- Ground disturbance (including access roads)
- Changes in water quality and quantity (both surface and underground water)
- Air quality
- Lighting effects
- Noise disturbance

Step 2: Access the Service’s Information for Planning and Consultation (IPaC) system
Go to https://ipac.ecosphere.fws.gov and click on GET STARTED. The following Steps 2a-2d are all within the IPaC system. If you are testing IPaC with a possible project that is not ready to be submitted to the Service, please use IPaC Beta https://ipacb.ecosphere.fws.gov.
Step 2a: Define your Action Area, as determined in Step 1 above by either uploading spatial files or drawing your Action Area, and then click CONTINUE.
Step 2b: Define your project by selecting the blue DEFINE PROJECT button at the bottom left. If you have not already logged in to IPaC, you will be required to do so now. Complete the Define Project form and click SAVE.
Step 2c: You should now see a map of your defined Action Area with a START REVIEW button on the right. Select ‘START REVIEW’ and after reading the Step-by-step consultation process, click CONTINUE, and then click on YES, REQUEST SPECIES LIST (required for OKES review), complete the required form, and click on the SUBMIT OFFICIAL SPECIES LIST REQUEST. Here you may choose to wait for your species list to load, otherwise you can access it later. Click on NEXT STEP: DETERMINATION KEYS.
Step 2d: Determination Keys (DKeys): Complete and Submit all applicable DKeys. The Service has performed up-front analyses which have been compiled into DKeys, a simple interview process to help you arrive at a recommended determination for all species in your action area. You have the option to forego one or more DKeys, but in that case you are required to complete Biological Assessment (BA) in its place and our evaluation of your project will likely take longer.
Oklahoma Determination Keys
All projects in Oklahoma should complete the Oklahoma Statewide Determination Key and any additional Determination Keys that may be available depending on project location and species present. For projects that extend beyond Oklahoma, the Oklahoma Determination Key will not be available - please contact our office or submit a Biological Assessment.
- Oklahoma Statewide Determination Key – available for all projects in Oklahoma
- American Burying Beetle Consultation and 4(d) Rule Consistency
- Bat DKeys – mostly in eastern Oklahoma – potentially three options:
- Northern Long-eared Bat and Tricolored Bat Range-wide Determination Key
- FHWA, FRA, FTA Programmatic Consultation for Transportation Projects affecting IBAT, NLEB, or TCB
- Department of War Determination Key for Indiana Bat, Northern Long-eared Bat and Tricolored Bat
Specific Steps include:
- Clicking EVAULATE for all applicable DKeys
- Clicking CHECK IF MY PROJECT QUALIFIES in each DKey and completing the Qualification Interview questions.
- Click SAVE AND CONTINUE after completing the questions
- Click GENERATE TECHNICAL ASSISTANCE LETTER, answer the remaining questions, and click.
Important Note: Completion of these steps for each DKey results in the submittal of your DKeys to the Service for review. In some cases, this may complete your project review submittal, but other situations may require submittal of more information for the Service’s review. See Step 3 below to ensure the Service has received all information necessary for review.
Additional Information: FAQ on IPaC and the Oklahoma Determination Keys (this FAQ will be a link to a document to place online – in development and will send with OK Project Review website update)
Step 3: Ensure all Appropriate Project Review Documentation has been Provided to the Oklahoma ESFO
Requirements in this step are based on the outcome of your determination keys:
All “No Effect” determinations
Federal agencies and their non-federal designated representatives are not required to contact us for “no effect” determinations, however we recommend you maintain these determinations for your records. For non-federal entities, we also recommend you maintain these documents for your records and no further assistance from the Service is necessary.
At least one “NLAA” (Not Likely to Adversely Affect) determination, and no “May Affect” determinations
Make sure to submit all applicable determination keys through IPaC (see Step 2d, above), including the Oklahoma Statewide Determination Key. Upon receipt of all your applicable DKeys, please allow the Oklahoma ESFO 30 days to review the information provided and respond, if necessary. If you have submitted all applicable determination keys and do not receive a response from the Oklahoma ESFO within 30 days, consider consultation (for Federal nexus projects) or technical assistance (for non-Federal projects) with our office complete.
At least one “May Affect” determination
Given that you have determined your project May Affect one or more species or designated critical habitat, further consultation with the Oklahoma ESFO is necessary. To help expedite our review of your project, the Service recommends developing a Biological Assessment that addresses impacts of the proposed project on those species with a May Affect determination. The biological assessment should include all listed and proposed species found in the action area, not just those listed and proposed species that may be affected. For those species where your DKeys determined NLAA or No Effect, you may simply reference those DKeys for your determination in the Biological Assessment (table format preferred) and no further analysis of those species will be necessary. For further assistance with developing a Biological Assessment, please contact the Oklahoma ESFO at okprojectreview@fws.gov.
Submit your Biological Assessment and all relevant DKeys to OKprojectreview@fws.gov, with the following in the Subject Line: “Project Code, Project Title, BA Review Request”, for example “2026-0005329, All-Star Road Project, BA Review Request”
Upon receipt of your Biological Assessment, please allow the Oklahoma ESFO 30 days to review the information provided and respond. If your project determination resulted in a May Affect determination and you submitted a Biological Assessment, or if you chose to develop a Biological Assessment in place of determination keys, the consultation will not be considered complete until you have written confirmation from the Oklahoma ESFO.
Potential DKey issues: If you believe the DKey is incorrect in its Likely to Adversely Affect determination, please provide necessary details and your rationale for why you have determined your project does result in a May Affect to federally-listed species and the Service will review your rationale. Please allow the Oklahoma ESFO to review your rationale and respond. The consultation will not be considered complete until you have written confirmation from the Oklahoma ESFO.
Step 4: Tribal and State Coordination
We strongly encourage you to engage with Tribal Governments that have interest in the area of your project to ensure that it would not have a significant impact on culturally significant resources to these Tribal Nations. See the Tribal Directory Assessment Tool for Oklahoma’s Tribal Nations by county.
We also recommend coordinating with the Oklahoma Department of Wildlife Conservation (ODWC) and the Oklahoma Natural Heritage Inventory (ONHI) to address any state resource concerns. Each agency maintains a different database and has differing expertise and responsibilities regarding biological resources.
These agencies may identify biological resources, other than federally listed species, that they have authority over and may occur within your action area. Any environmental concerns raised by either the ODWC or ONHI must be coordinated with them, not the Service.
The Service recommends including any correspondence from Tribal Nations, ODWC, or ONHI in your Project Review Package. However, the Service will not require that such correspondence be received from these agencies prior to submitting your Project Review Package. This means you can submit your Project Review Package without correspondence from Tribal Nations, ODWC, or ONHI.
Step 5: Additional Considerations and Information to Assist with Compliance
Other Trust Resource and Useful Links
- Migratory Bird Treaty Act
- Reducing Impacts to Migratory Birds
- Bald and Golden Eagle Protection Act
- Endangered Species Act
- National ESA Section 7 Consultation Webpage
- Emergency Consultation Procedures
- Emergency Consultation Flow Chart
- Habitat Conservation Plans
- National Environmental Protection Act
- Tribal Directory Assessment Tool